Skip to content
ElectricBillTool India's Bill Calculator
Maharashtra • Effective 2025-04-01

MSEDCL Per Unit Electricity Rate (2026)

Maharashtra State Electricity Distribution Co. Ltd.. Domestic per-unit rates from ₹4.71 to ₹16.64 per kWh — plus commercial and industrial slabs, FAC and duty. Latest SERC-approved tariff.

Slab 1 rate

₹4.71

first 100 units

Top slab

₹16.64

per unit

Eff. @ 100u

₹8.43

all-in /unit

MSEDCL domestic slab rates

Energy charge per unit — the headline price you see on your bill. Excludes fixed, FAC and duty.

Slab (units / month) Energy rate (₹/unit)
1 – 100 ₹4.71
101 – 300 ₹10.29
301 – 500 ₹14.55
Above 500 ₹16.64
Fixed charges
₹128/kW/mo
FAC / FPPCA
Electricity duty
16%
Telescopic
Yes

Commercial (LT) per-unit rates

For shops, offices and small businesses on a LT-2 / commercial connection.

Slab (units / month) Energy rate (₹/unit)
1 – 200 ₹12.88
Above 200 ₹15.74
Fixed charges
₹442/kW/mo
FAC / FPPCA
Electricity duty
21%
Telescopic
Yes

Industrial (LT) per-unit rates

For LT industrial consumers — typically a flat per-unit rate.

Slab (units / month) Energy rate (₹/unit)
Above 0 ₹8.64
Fixed charges
₹378/kW/mo
FAC / FPPCA
Electricity duty
9.3%
Telescopic
No

Effective MSEDCL per-unit rate by consumption

All-in rate (energy + fixed @ 2 kW + FAC + duty) at common monthly consumption levels. Excludes subsidy.

At 50 units/month

₹11.40

≈ ₹570 bill

At 100 units/month

₹8.43

≈ ₹843 bill

At 150 units/month

₹9.60

≈ ₹1,440 bill

At 200 units/month

₹10.18

≈ ₹2,037 bill

At 300 units/month

₹10.77

≈ ₹3,231 bill

At 500 units/month

₹13.21

≈ ₹6,606 bill

At 1000 units/month

₹16.26

≈ ₹16,257 bill

For your actual figure with your sanctioned load and subsidy eligibility, use the MSEDCL bill calculator.

About MSEDCL tariff structure

Maharashtra State Electricity Distribution Co. Ltd. bills domestic consumers using a telescopic slab structure. Each slab applies only to the units within that range, so adding a few more units never reprices your earlier (cheaper) units.

Beyond energy charges, the MSEDCL bill includes a fixed charge of ₹128/kW/month on your sanctioned load, an FAC pass-through of ₹0.00/unit (revised monthly), and Maharashtra electricity duty of 16%.

We verify MSEDCL rates against the latest SERC tariff order quarterly. Last verified: 2026-04-22. Original source: official tariff order.

Other Maharashtra DISCOMs

Compare per-unit rates across Maharashtra.

MSEDCL per-unit rate — common questions

Answers to the most common electricity bill questions in India.

What is the per unit electricity rate of MSEDCL in 2026?
MSEDCL domestic energy charges start at ₹4.71/unit for the first 100 units and rise to ₹16.64/unit at the highest slab. Slabs are telescopic — only units within each slab are billed at that rate. See the full slab table on this page. Effective 2025-04-01.
How much will 1 unit of electricity cost on my MSEDCL bill?
1 unit (1 kWh) is billed at the slab rate that applies to your monthly consumption — starting at ₹4.71/unit. The effective rate on your bill is higher because of fixed charges (₹128/kW), FAC, and electricity duty (16%). At a 100-unit monthly consumption, the all-in rate is roughly ₹8.43/unit.
What is the commercial per-unit rate for MSEDCL?
MSEDCL commercial (LT) energy charges start at ₹12.88/unit and go up to ₹15.74/unit. Commercial fixed charges are ₹442/kW/month — typically higher than domestic. Industrial (LT) is usually a flat ₹8.64/unit.
What is the FAC and electricity duty for MSEDCL?
MSEDCL currently passes through ₹0.00/unit as Fuel Adjustment Charge (FAC / FPPCA — varies monthly). Maharashtra electricity duty is 16% on the energy + fixed + FAC base. These add to your effective per-unit cost beyond the headline slab rate.
How often does MSEDCL change its per-unit rates?
Slab rates are revised through the annual SERC tariff order — typically effective from 1 April each financial year. The current MSEDCL rates are effective from 2025-04-01. FAC is revised more frequently (often monthly) to reflect fuel cost movements.