TNEB / TANGEDCO Per Unit Electricity Rate (2026)
Tamil Nadu Generation and Distribution Corporation. Domestic per-unit rates from ₹0.00 to ₹8.40 per kWh — plus commercial and industrial slabs, FAC and duty. Latest SERC-approved tariff.
Slab 1 rate
₹0.00
first 100 units
Top slab
₹8.40
per unit
Eff. @ 100u
₹0.27
all-in /unit
TNEB / TANGEDCO domestic slab rates
Energy charge per unit — the headline price you see on your bill. Excludes fixed, FAC and duty.
| Slab (units / month) | Energy rate (₹/unit) |
|---|---|
| 1 – 100 | ₹0.00 |
| 101 – 200 | ₹2.35 |
| 201 – 400 | ₹4.70 |
| 401 – 500 | ₹6.30 |
| Above 500 | ₹8.40 |
- Fixed charges
- Slab-based
- FAC / FPPCA
- —
- Electricity duty
- 6%
- Telescopic
- Yes
Commercial (LT) per-unit rates
For shops, offices and small businesses on a LT-2 / commercial connection.
| Slab (units / month) | Energy rate (₹/unit) |
|---|---|
| Above 0 | ₹8.95 |
- Fixed charges
- ₹80/kW/mo
- FAC / FPPCA
- —
- Electricity duty
- 6%
- Telescopic
- No
Industrial (LT) per-unit rates
For LT industrial consumers — typically a flat per-unit rate.
| Slab (units / month) | Energy rate (₹/unit) |
|---|---|
| Above 0 | ₹7.50 |
- Fixed charges
- ₹70/kW/mo
- FAC / FPPCA
- —
- Electricity duty
- 6%
- Telescopic
- No
Effective TNEB / TANGEDCO per-unit rate by consumption
All-in rate (energy + fixed @ 2 kW + FAC + duty) at common monthly consumption levels. Excludes subsidy.
At 50 units/month
₹0.53
≈ ₹27 bill
At 100 units/month
₹0.27
≈ ₹27 bill
At 150 units/month
₹1.01
≈ ₹151 bill
At 200 units/month
₹1.38
≈ ₹276 bill
At 300 units/month
₹2.58
≈ ₹774 bill
At 500 units/month
₹3.88
≈ ₹1,940 bill
At 1000 units/month
₹6.39
≈ ₹6,392 bill
For your actual figure with your sanctioned load and subsidy eligibility, use the TNEB / TANGEDCO bill calculator.
About TNEB / TANGEDCO tariff structure
Tamil Nadu Generation and Distribution Corporation bills domestic consumers using a telescopic slab structure. Each slab applies only to the units within that range, so adding a few more units never reprices your earlier (cheaper) units.
Beyond energy charges, the TNEB / TANGEDCO bill includes a fixed charge of a load-band based amount on your sanctioned load, an FAC pass-through of ₹0.00/unit (revised monthly), and Tamil Nadu electricity duty of 6%.
We verify TNEB / TANGEDCO rates against the latest SERC tariff order quarterly. Last verified: 2026-04-22. Original source: official tariff order.
TNEB / TANGEDCO per-unit rate — common questions
Answers to the most common electricity bill questions in India.