Torrent Power (Surat) Per Unit Electricity Rate (2026)
Torrent Power — Surat. Domestic per-unit rates from ₹3.20 to ₹5.40 per kWh — plus commercial and industrial slabs, FAC and duty. Latest SERC-approved tariff.
Slab 1 rate
₹3.20
first 50 units
Top slab
₹5.40
per unit
Eff. @ 100u
₹7.36
all-in /unit
Torrent Power (Surat) domestic slab rates
Energy charge per unit — the headline price you see on your bill. Excludes fixed, FAC and duty.
| Slab (units / month) | Energy rate (₹/unit) |
|---|---|
| 1 – 50 | ₹3.20 |
| 51 – 100 | ₹3.70 |
| 101 – 250 | ₹4.40 |
| Above 250 | ₹5.40 |
- Fixed charges
- ₹30/kW/mo
- FAC / FPPCA
- ₹2.35/unit
- Electricity duty
- 15%
- Telescopic
- Yes
Commercial (LT) per-unit rates
For shops, offices and small businesses on a LT-2 / commercial connection.
| Slab (units / month) | Energy rate (₹/unit) |
|---|---|
| Above 0 | ₹5.50 |
- Fixed charges
- ₹80/kW/mo
- FAC / FPPCA
- ₹2.35/unit
- Electricity duty
- 20%
- Telescopic
- No
Industrial (LT) per-unit rates
For LT industrial consumers — typically a flat per-unit rate.
| Slab (units / month) | Energy rate (₹/unit) |
|---|---|
| Above 0 | ₹5.30 |
- Fixed charges
- ₹110/kW/mo
- FAC / FPPCA
- ₹2.35/unit
- Electricity duty
- 15%
- Telescopic
- No
Effective Torrent Power (Surat) per-unit rate by consumption
All-in rate (energy + fixed @ 2 kW + FAC + duty) at common monthly consumption levels. Excludes subsidy.
At 50 units/month
₹7.76
≈ ₹388 bill
At 100 units/month
₹7.36
≈ ₹736 bill
At 150 units/month
₹7.49
≈ ₹1,124 bill
At 200 units/month
₹7.56
≈ ₹1,512 bill
At 300 units/month
₹7.82
≈ ₹2,346 bill
At 500 units/month
₹8.26
≈ ₹4,129 bill
At 1000 units/month
₹8.58
≈ ₹8,585 bill
For your actual figure with your sanctioned load and subsidy eligibility, use the Torrent Power (Surat) bill calculator.
About Torrent Power (Surat) tariff structure
Torrent Power — Surat bills domestic consumers using a telescopic slab structure. Each slab applies only to the units within that range, so adding a few more units never reprices your earlier (cheaper) units.
Beyond energy charges, the Torrent Power (Surat) bill includes a fixed charge of ₹30/kW/month on your sanctioned load, an FAC pass-through of ₹2.35/unit (revised monthly), and Gujarat electricity duty of 15%.
We verify Torrent Power (Surat) rates against the latest SERC tariff order quarterly. Last verified: 2026-04-22. Original source: official tariff order.
Other Gujarat DISCOMs
Compare per-unit rates across Gujarat.
MGVCL
Madhya Gujarat Vij Company Ltd.
From ₹3.05/unit →
UGVCL
Uttar Gujarat Vij Company Ltd.
From ₹3.05/unit →
DGVCL
Dakshin Gujarat Vij Company Ltd.
From ₹3.05/unit →
PGVCL
Paschim Gujarat Vij Company Ltd.
From ₹3.05/unit →
Torrent Power (Ahmedabad)
Torrent Power — Ahmedabad / Gandhinagar
From ₹3.20/unit →
Torrent Power (Surat) per-unit rate — common questions
Answers to the most common electricity bill questions in India.